Up Smallcleugh Mine - Hydraulic Shaft, (25/02/06) Prev Next

 Previous image  At last page  Index page
rg_hangingshaw_nw_1stjunc_rise
rg_hangingshaw_nw_1stjunc_ne_level
rg_hangingshaw_nw_1stjunc_sw_level1
rg_hangingshaw_nw_1stjunc_mud
rg_hangingshaw_nw_1stjunc_sw_level2
  rg_hangingshaw_nw_1stjunc_sw_level3.jpg - Some 10m into the passage this big calcified mud mound greets you. From the plan that we have we think that this is a 4 way junction. To the right should be a passage or rise to the Drawing Sump, to the left a link to the rise with the ladder we saw before and straight on a link to the Caplecleugh Level.  
 
 
 
 
 

Some 10m into the passage this big calcified mud mound greets you. From the plan that we have we think that this is a 4 way junction. To the right should be a passage or rise to the Drawing Sump, to the left a link to the rise with the ladder we saw before and straight on a link to the Caplecleugh Level.
Total images: 25 | Last update: 08/07/11 07:45 | Help