Up Firestone Level Dig - Lighting, Stabilisation of the Chamber and Shaft Digging, (28/03/10). Prev Next Slideshow

 Previous image  Next image  Index page
 
 
 
 
IMG_3144
  IMG_3145.jpg - Pouring water into the pump barrel.  
IMG_3148
IMG_3150
IMG_3154
IMG_3156
IMG_3157

Pouring water into the pump barrel.
Total images: 28 | Last update: 18/06/11 07:52 | Help