Up Caplecleugh High Level Survey from Adits (05/10/07) Prev Next Slideshow

 Previous image  Next image  Index page
cch_viewdownstairs1
cch_spillway_planks1
cch_waterdrain
cch_corner_alcove3
cch_spillway_rails1
  cch_spillway_sideing2.jpg - The small siding and points, this is also where the spillway starts to deteriorate a bit. it is interesting that the concrete is actually reduced to a fine gravel.  
cch_startofspillway2
cch_startofspillway1
cch_1st_fall
cch_concrete&rock_pass2
cch_airshaft

The small siding and points, this is also where the spillway starts to deteriorate a bit. it is interesting that the concrete is actually reduced to a fine gravel.
Total images: 29 | Last update: 27/06/11 17:00 | Help