Up Caplecleugh High Level Surface Features Prev Next Slideshow

 Previous image  Next image  Index page
cch_mainadit_2
cch_mineworkshop1
cch_mineworkshop4
cch_manhole
cch_viewoutfromadit
  cch_highadit_1.jpg - The second Caplecleugh High adit, which leads down to the spillway via steps. This was taken in the winter of 2005.  
cch_highadit_4
cch_highadit_2
 
 
 

The second Caplecleugh High adit, which leads down to the spillway via steps. This was taken in the winter of 2005.
Total images: 8 | Last update: 27/06/11 08:58 | Help