Up Caplecleugh Firestone Level Pump Out (11/01/08) Prev Next Slideshow

 Previous image  Next image  Index page
ccf_endofarching_2
ccf_insidedrainedlevel_2
ccf_pillar_leftbranch_2
ccf_pillar_top
ccf_silt_deposit_2
  ccf_final_waterdrop2.jpg - The pump was left running whilst we had a look inside and this was the final water level.  
ccf_afterexplore
 
 
 
 

The pump was left running whilst we had a look inside and this was the final water level.
Total images: 15 | Last update: 27/06/11 08:52 | Help